Generalities
|
|
Details
- City: Consett
- Commissioning: 2012/07
- 6 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Hub height: 64 m
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developer: RWE
- Operator: RWE
- Owner: RWE
Production forecast
- From Saturday, December 07 2019, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 65.1 %
- Expected production: 215,570 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 54° 53' 3.1"
- Longitude: -1° 54' 55.5"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 20 May 2019