Wind farms
Torre Madrina (Spain)| Torre Madrina (Spain) |
|
| Operational (50 MW) |

| Country | Spain |
| County/Zone | Tarragona (Cataluna) |
| City | Batea - Gandesa |
| Wind farm type | Onshore wind farm |

![]() | 25 MW commissioned |
![]() | 25 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 2.5xl (x 20) |

| No source available |

| Part | Fase A |
| City | Batea, Gandesa |
| Commissioning | ![]() |
| Turbines | 10x GE Vernova 2.5xl (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 25,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 4' 16.2" - Longitude 0° 21' 27" |
| Precise localization | Yes |
| Part | Fase B |
| City | Batea, Gandesa |
| Commissioning | ![]() |
| Turbines | 10x GE Vernova 2.5xl (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 25,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 4' 16.2" - Longitude 0° 21' 27" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tres Termes (5 km) Punta Redona (7 km) Coll de Moro I y II (7 km) Vilalba dels Arcs (7 km) Vilalba del Arcs (7 km) Les Comes (7 km) Mudéfer (7 km) Mudéfer II (7 km) Corbera (12 km) Fatarella (17 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Tarragona (Cataluna) : 874.6 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 11 October 2024 |
||