Wind farms
Orsted (Norddjurs) (Denmark)| Orsted (Norddjurs) (Denmark) |
|
| Operational (3,75 MW) - Dismantled (4,2 MW) |

| Country | Denmark |
| County/Zone | Norddjurs (Midtjylland) |
| City | Orsted |
| Wind farm type | Onshore wind farm |

![]() | 3.9 MW commissioned |
![]() | 0.3 MW commissioned |
![]() | 2.25 MW commissioned |
![]() | 1.5 MW commissioned |
![]() | 3.9 MW decommissioned |
![]() | 0.3 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturers |
|

| Operational | Neg Micon NM48/750 (x 5) |
| Dismantled | Nordtank NTK130/22 (x 30) |
| Dismantled | Nordtank NTK300/31 (x 1) |

![]() | |

| City | Orsted |
| Commissioning | ![]() |
| Turbines | 3x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 2,250 kW |
| Status | Operational |
| Coordinates | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Precise localization | No |
| City | Orsted |
| Commissioning | ![]() |
| Turbines | 2x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Coordinates | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Precise localization | No |
| City | Orsted |
| Commissioning | ![]() |
| Turbines | 30x Nordtank NTK130/22 (power 130 kW, diameter 21.5 m) |
| Hub height | ![]() |
| Total nominal power | 3,900 kW |
| Status | Dismantled (2002/10) |
| Coordinates | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Precise localization | No |
| City | Orsted |
| Commissioning | ![]() |
| Turbine | 1x Nordtank NTK300/31 (power 300 kW, diameter 31 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2002/10) |
| Coordinates | Latitude 56° 29' 43.3" - Longitude 10° 16' 25.9" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hollanadsbjerg - Orsted (0 km) Hollandsbjerg (2 km) Torslev (Norddjurs) (6 km) Langkastrup (6 km) Virring (Randers) (6 km) Hevring (7 km) Tammestrup (8 km) Lindbjerg (9 km) Harridslev (9 km) Vestrup (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Norddjurs (Midtjylland) : 57.0 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 April 2019 |
||