Wind farms
Selde (Denmark)| Selde (Denmark) |
|
| Dismantled (0,6 MW) |

| Country | Denmark |
| County/Zone | Skive (Midtjylland) |
| City | Selde |
| Wind farm type | Onshore wind farm |

![]() | 0.15 MW commissioned |
![]() | 0.45 MW commissioned |
![]() | 0.15 MW decommissioned |
![]() | 0.45 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Dismantled | Nordtank NTK150/25 (x 3) |
| Dismantled | Nordtank 150XLR (x 1) |

![]() | |

| City | Selde |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2002/11) |
| Coordinates | Latitude 56° 46' 48" - Longitude 9° 2' 46.4" |
| Precise localization | No |
| City | Selde |
| Commissioning | ![]() |
| Turbines | 3x Nordtank NTK150/25 (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 450 kW |
| Status | Dismantled (2002/11) |
| Coordinates | Latitude 56° 46' 48" - Longitude 9° 2' 46.4" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Lindum (2 km) Lindum Vindmollepark (2 km) Risum (2 km) Floutrup (2 km) Junget (4 km) Thorum (4 km) Asted (Skive) (4 km) Torum (4 km) Tondering (5 km) Nissum (Skive) (6 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Skive (Midtjylland) : 139.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 April 2017 |
||