Wind farms
Harridslev (Denmark)| Harridslev (Denmark) |
|
| Dismantled (0,6 MW) |

| Country | Denmark |
| County/Zone | Randers (Midtjylland) |
| City | Harridslev |
| Wind farm type | Onshore wind farm |

![]() | 0.3 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.15 MW commissioned |
![]() | 0.3 MW decommissioned |
![]() | 0.15 MW decommissioned |
![]() | 0.15 MW decommissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Dismantled | Nordtank 150XLR (x 4) |

![]() | |

| City | Harridslev |
| Commissioning | ![]() |
| Turbines | 2x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 300 kW |
| Status | Dismantled (2003/11) |
| Coordinates | Latitude 56° 29' 59.2" - Longitude 10° 7' 43.9" |
| Precise localization | No |
| City | Harridslev |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2003/11) |
| Coordinates | Latitude 56° 29' 59.2" - Longitude 10° 7' 43.9" |
| Precise localization | No |
| City | Harridslev |
| Commissioning | ![]() |
| Turbine | 1x Nordtank 150XLR (power 150 kW, diameter 24.6 m) |
| Hub height | ![]() |
| Total nominal power | 150 kW |
| Status | Dismantled (2008/09) |
| Coordinates | Latitude 56° 29' 59.2" - Longitude 10° 7' 43.9" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Vestrup (2 km) Lindbjerg (3 km) Mejlby (Randers) (3 km) Jennum by - Spentrup (6 km) Ilshoj-Torslev (7 km) Tammestrup (8 km) Langkastrup (8 km) Assentoft (8 km) Hollandsbjerg (8 km) Orsted (Norddjurs) (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Randers (Midtjylland) : 294.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 April 2017 |
||