Wind farms
Santa Maria de Nieva (Spain)| Santa Maria de Nieva (Spain) |
|
| Operational (50 MW) |

| Country | Spain |
| County/Zone | Almeria (Andalucía) |
| Wind farm type | Onshore wind farm |

![]() | 36 MW commissioned |
![]() | 14 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G87/2000 (x 25) |

![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 18x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Hub height | ![]() |
| Total nominal power | 36,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 27' 44.2" - Longitude -1° 59' 19.5" |
| Precise localization | No |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 7x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Hub height | ![]() |
| Total nominal power | 14,000 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 27' 44.2" - Longitude -1° 59' 19.5" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (658.4 GW) World (2,459.0 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Tijola (42 km) La Cerradilla (45 km) El Carrascal I (45 km) El Carrascal II (45 km) Serón I (48 km) Serón II (48 km) La Cerradilla II (48 km) La Noguera (55 km) Nacimiento (71 km) Loma de Ayala (71 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Almeria (Andalucía) : 523.7 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 27 June 2024 |
||