Generalities
|
|
Details
Part #1:
- Part: Part 2
- City: Tuoli
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Guodian Tacheng Power Co
- Owners:
/ND
Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 81.7 %
- Expected production: 980,750 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Part 3
- City: Tuoli
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: China Power Investment Corporation
- Owner:

Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 85.6 %
- Expected production: 1,027,400 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Part: Part 4
- City: Tuoli
- Commissioning:

- Turbine(s): (manufacturer name not available)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: China Power Investment Corporation
- Owner:

Production forecast
- From Wednesday, October 4 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 57.5 %
- Expected production: 690,530 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: Part 2
- Latitude: 46° 10' 56.9"
- Longitude: 84° 12' 5"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Part 3
- Latitude: 45° 25' 58.4"
- Longitude: 82° 35' 48.4"
- Geodetic system: WGS84
- Precise localization: no
Part #3:
- Part: Part 4
- Latitude: 45° 56' 12.8"
- Longitude: 83° 36' 22.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 2 September 2022