[Back to previous page]
Details
- City: Ansauvillers, Gannes, Quinquempoix, Saint-Just-en-Chaussée, Wavignies
- Commissioning:

- 13 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 29,900 kW
- Operational
- Onshore wind farm
- Developer: Energieteam
- Operators: Energieteam/CNR
- Owner:

- Source:

Production forecast
- From Sunday, May 29 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 11.8 %
- Expected production: 84,710 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 49° 32' 54.2"
- Longitude: 2° 24' 22.8"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 23 August 2021
Complete/correct this sheet: