[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Großhofen
- Commissioning:

- 4 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Developer: ImWind
- Operator: IWP Großhofen GmbH
Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 21.6 %
- Expected production: 47,690 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Großhofen
- Commissioning:

- 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Developer: ImWind
- Operator: IWP Großhofen GmbH
- Source:

- Source:

Production forecast
- From Thursday, November 30 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 23.2 %
- Expected production: 25,650 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 48° 14' 52.9"
- Longitude: 16° 36' 31.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 48° 14' 52.9"
- Longitude: 16° 36' 31.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 November 2022
Complete/correct this sheet: