[Back to previous page]
Generalities
|
|
Details
- City: Valverde
- Commissioning:

- 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
- Total nominal power: 11,500 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, December 4 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 27° 48' 31.3"
- Longitude: -17° 55' 25.3"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 15 August 2022
Complete/correct this sheet: