Wind farms
Ascoli Satriano (Italy)| Ascoli Satriano (Italy) |
|
| Operational (109 MW) |

| Country | Italy |
| County/Zone | Puglia |
| City | Ascoli Satriano |
| Wind farm type | Onshore wind farm |

![]() | 15 MW commissioned |
![]() | 46.8 MW commissioned |
![]() | 32.8 MW commissioned |
![]() | 12.6 MW commissioned |
![]() | 1.8 MW commissioned |

| Developer | #ND |
| Operators |
![]() ![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
#ND |

| Operational | Vestas V90/1800 (x 26) |
| Operational | Repower MM92 Evo (x 16) |
| Operational | Vestas V90/3000 (x 5) |
| Operational | #ND (x 3) |
| Operational | PowerWind 56 (x 2) |

![]() | |
![]() | |

| City | Ascoli Satriano |
| Commissioning | ![]() |
| Turbines | 5x Vestas V90/3000 (power 3,000 kW, diameter 90 m) |
| Total nominal power | 15,000 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 8' 28.9" - Longitude 15° 38' 49.6" |
| Precise localization | Yes |
| City | Ascoli Satriano |
| Turbines | 2x PowerWind 56 (power 900 kW, diameter 56 m) |
| Total nominal power | 1,800 kW |
| Status | Operational |
| Operator | ND |
| Coordinates | Latitude 41° 9' 42.3" - Longitude 15° 38' 25.2" |
| Precise localization | Yes |
| City | Ascoli Satriano |
| Commissioning | ![]() |
| Turbines | 26x Vestas V90/1800 (power 1,800 kW, diameter 90 m) |
| Total nominal power | 46,800 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 41° 8' 28.9" - Longitude 15° 38' 49.6" |
| Precise localization | Yes |
| City | Ascoli Satriano |
| Commissioning | ![]() |
| Turbines | 16x Repower MM92 Evo (power 2,050 kW, diameter 92.5 m) |
| Hub height | ![]() |
| Total nominal power | 32,800 kW |
| Status | Operational |
| Coordinates | Latitude 41° 10' 9" - Longitude 15° 38' 40.6" |
| Precise localization | Yes |
Databases ![]() Italy (102.1 GW) Europe (666.7 GW) World (2,490.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Matisse (5 km) Nannarone (8 km) Stornarella Wind (11 km) Candela (11 km) Maia Project (12 km) Serro di Lucca II (12 km) Taverna Caduta (12 km) Ordona (13 km) Melfi I (13 km) Serro di Lucca (13 km) | ||
|
Insights Production capacity Italy : 13,481.0 MW (end of 2025) Puglia : 2,713.4 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 24 August 2026 |
||