[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Harelbeke
- Commissioning:

- 2 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:

- Total nominal power: 4,100 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 65.5 %
- Expected production: 64,450 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Harelbeke
- Commissioning:

- 1 turbine: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
- Hub height:

- Total nominal power: 2,050 kW
- Operational
- Onshore wind farm
- Operator: Engie
- Source:

Production forecast
- From Thursday, December 7 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 51.7 %
- Expected production: 25,460 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 50° 49' 32"
- Longitude: 3° 19' 54.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 50° 49' 32"
- Longitude: 3° 19' 54.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 17 March 2021
Complete/correct this sheet: