Wind farms
Jumbo Road (USA)| Jumbo Road (USA) |
|
| Operational (299,7 MW) |

| Country | USA |
| County/Zone | Texas |
| City | Castro |
| Other name | Hereford II |
| Wind farm type | Onshore wind farm |

![]() | 299.7 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.85-87 (x 162) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 34° 43' 40.3" - Longitude -102° 14' 21.5" |
| Precise localization | Yes |
Databases ![]() USA (255.3 GW) Americas (617.8 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Hereford I (2 km) Falvez Astra (18 km) Bethel (TX) (28 km) Hart Wind (42 km) Mariah North (45 km) UL Advanced Wind Turbine Test Facility (49 km) Canadian Breaks (53 km) Golden Spread Panhandle Wind Ranch (56 km) Wildorado (62 km) Broadview Wind (TX) (67 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Texas : 51,338.2 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 25 May 2026 |
||