[Back to previous page]
Details
Part #1:
- City: Zgorzelec
- Commissioning:

- 12 turbines: Gamesa G90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 24,000 kW
- Operational
- Onshore wind farm
- Developer: EDP Renovaveis
- Operator: EDP Renovaveis
- Owner:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 63.5 %
- Expected production: 365,610 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Zgorzelec
- Commissioning:

- 13 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 26,000 kW
- Operational
- Onshore wind farm
- Developer: EDP Renovaveis
- Operator: EDP Renovaveis
- Owner:

Production forecast
- From Saturday, May 28 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 67.1 %
- Expected production: 418,770 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 51° 5' 7.9"
- Longitude: 15° 1' 29.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 5' 7.9"
- Longitude: 15° 1' 29.1"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 30 April 2018
Complete/correct this sheet: