[Back to previous page]
Generalities
|
|
Details
- City: Castlederg
- Commissioning:

- 1 turbine: (manufacturer name not available)
- Total nominal power: 225 kW
- Operational
- Onshore wind farm
Production forecast
- From Monday, June 12 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 3.6 %
- Expected production: 200 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 54° 42' 29.5"
- Longitude: -7° 35' 32.4"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 4 March 2020
Complete/correct this sheet: