[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Torres Vedras
- Commissioning:

- 7 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 35.9 %
- Expected production: 120,730 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Torres Vedras
- Commissioning:

- 6 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Developer: ENEOP
- Operator: ENEOP
- Owner:

- Source:

Production forecast
- From Tuesday, January 19 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 32.1 %
- Expected production: 106,240 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 39° 2' 48.2"
- Longitude: -9° 18' 34.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 39° 2' 48.2"
- Longitude: -9° 18' 34.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: