Wind farms
Malhanito (Portugal)| Malhanito (Portugal) |
|
| Operational (66,7 MW) |

| Country | Portugal |
| County/Zone | Faro (Algarve) |
| City | Tavira |
| Wind farm type | Onshore wind farm |

![]() | 34.5 MW commissioned |
![]() | 32.2 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Enercon E82/2300 (x 29) |

![]() | |
![]() | |

| Part | Cerro do Gato |
| City | Tavira |
| Commissioning | ![]() |
| Turbines | 15x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Total nominal power | 34,500 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 37° 19' 25.5" - Longitude -7° 47' 31.5" |
| Precise localization | Yes |
| Part | Passa Frio |
| City | Tavira |
| Commissioning | ![]() |
| Turbines | 14x Enercon E82/2300 (power 2,300 kW, diameter 82 m) |
| Total nominal power | 32,200 kW |
| Status | Operational |
| Operator | ND |
| Owner | ND |
| Coordinates | Latitude 37° 19' 25.5" - Longitude -7° 47' 31.5" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Mertola I (20 km) Serra do Mu (27 km) Monte Gordo (34 km) Ayamonte (36 km) Los Lirios (37 km) El Sardón (38 km) El Granado (39 km) Pico Alto (40 km) Valdefuentes (47 km) La Retuerta (Fase B) (48 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Faro (Algarve) : 246.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 November 2025 |
||