[Back to previous page]
Details
Part #1:
- Commissioning:

- 2 turbines: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developer: Generg
- Operator: Generg
- Owner:

- Source:

- Source:

Production forecast
- From Thursday, May 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.6 %
- Expected production: 12,090 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Commissioning:

- 19 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 38,000 kW
- Operational
- Onshore wind farm
- Developer: Generg
- Operator: Ventinveste
- Owner:

- Source:

- Source:

Production forecast
- From Thursday, May 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.4 %
- Expected production: 140,660 kWh
- Values from Weathernews Windcaster solution
Part #3:
- Commissioning:

- 36 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Total nominal power: 72,000 kW
- Operational
- Onshore wind farm
- Developer: Generg
- Operator: Ventinveste
- Owner:

- Source:

- Source:

Production forecast
- From Thursday, May 26 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 15.4 %
- Expected production: 266,520 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 40° 3' 59.7"
- Longitude: -7° 40' 8.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 40° 3' 59.7"
- Longitude: -7° 40' 8.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 40° 3' 59.7"
- Longitude: -7° 40' 8.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 18 December 2021
Complete/correct this sheet: