[Back to previous page]
Details
- City: La Chapelle Laurent
- Commissioning:

- 3 turbines: Vestas V100/2000 (power 2 000 kW, diameter 100 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developer: Volkswind
- Operator: Volkswind
- Owner:

Production forecast
- From Saturday, July 02 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 45° 11' 24.8"
- Longitude: 3° 14' 25.4"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 26 November 2021
Complete/correct this sheet: