Wind farms
Valbonilla Fase II (Spain)| Valbonilla Fase II (Spain) |
|
| Operational (6,85 MW) |

| Country | Spain |
| County/Zone | Burgos (Castilla y Leon) |
| City | Castrojeriz |
| Wind farm type | Onshore wind farm |

![]() | 6 MW commissioned |
![]() | 0.85 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G80/2000 (x 3) |
| Operational | Gamesa G58/850 (x 1) |

| No source available |

| City | Castrojeriz |
| Turbines | 3x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 14' 9.3" - Longitude -4° 11' 25.1" |
| Precise localization | No |
| City | Castrojeriz |
| Turbine | 1x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 850 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 42° 14' 9.3" - Longitude -4° 11' 25.1" |
| Precise localization | No |
Databases ![]() Spain (57.5 GW) Europe (663.7 GW) World (2,464.1 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Valbonilla Fase I (0 km) Carrasquillo (1 km) El Carril II (2 km) El Navazo Fase I (2 km) El Navazo Fase II (3 km) El Carril (4 km) Ballestas et Casetona (4 km) La Zarzuela (7 km) El Teruelo (7 km) Alto de la Degollada (7 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Burgos (Castilla y Leon) : 2,389.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 11 August 2023 |
||