Chiripa (Costa Rica)| Chiripa (Costa Rica) |
|
| Operational (49,5 MW) |

| Country | Costa Rica |
| County/Zone | Guanacaste |
| City | Tilaran |
| Wind farm type | Onshore wind farm |

![]() | 49.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Acciona AW-1500/77 (x 33) |

| No source available |

| Coordinates | Latitude 10° 26' 14.5" - Longitude -84° 54' 44.1" |
| Precise localization | Yes |
Databases ![]() Americas (617.8 GW) World (2,460.7 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Miramar (CR) (4 km) La Perla (4 km) Vientos del Este (9 km) Aeroenergia (10 km) Tilawind (11 km) Altamira (CR) (12 km) Campos Azules (12 km) Western Lake Arenal (13 km) Tejona (15 km) Molinos Viento del Arenal (21 km) | ||
|
Insights Production capacity Costa Rica : 437.0 MW (end of 2025) Guanacaste : 385.6 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|