[Back to previous page]
Generalities
|
|
Details
- City: Hinojosa del Campo, Ólvega, Pozalmuro
- Commissioning:

- 23 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Total nominal power: 17,250 kW
- Operational
- Onshore wind farm
- Developer: Acciona Energia
- Operator: Acciona Energia
- Owner:

Production forecast
- From Friday, December 8 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 57 %
- Expected production: 236,110 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 41° 46' 12"
- Longitude: -2° 1' 47.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 10 August 2023
Complete/correct this sheet: