Wind farms
Janville (28) (France)| Janville (28) (France) |
|
| Operational (23 MW) |

| Country | France |
| County/Zone | 28 (Centre-Val de Loire) |
| City | Janville - Poinville - Santilly |
| Wind farm type | Onshore wind farm |

![]() | 11.5 MW commissioned |
![]() | 11.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Nordex N90/2300 (x 10) |

![]() | |

| Part | Bois Clergeons |
| City | Janville, Poinville |
| Commissioning | ![]() |
| Turbines | 5x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 11,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 48° 11' 12.9" - Longitude 1° 53' 34.4" |
| Precise localization | Yes |
| Part | Voie Blériot Est |
| City | Poinville, Santilly |
| Commissioning | ![]() |
| Turbines | 5x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 11,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 48° 9' 8.6" - Longitude 1° 53' 47.1" |
| Precise localization | Yes |
Databases ![]() France (32.0 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Janville (45) (1 km) Champ-Besnard (2 km) Tivernon (2 km) Chemin de Tuleras (2 km) Lion-en-Beauce (3 km) Hauts de Melleray (7 km) Butte Saint-Liphard (7 km) Bois du Frou (8 km) La Brière (9 km) Guilleville (10 km) | ||
|
Insights Production capacity France : 26,372.0 MW (end of 2025) 28 (Centre-Val de Loire) : 869.5 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 14 November 2025 |
||