[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Zistersdorf
- Commissioning:

- 6 turbines: Vestas V112/3000 (power 3 000 kW, diameter 112 m)
- Hub height:

- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
- Developer: ImWind
- Owner:

- Source:

- Source:

Production forecast
- From Wednesday, December 6 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 2 %
- Expected production: 8,660 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Zistersdorf
- Commissioning:

- 3 turbines: Enercon E101/3000 (power 3 000 kW, diameter 101 m)
- Hub height:

- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
- Owner:

- Source:

- Source:

Production forecast
- From Wednesday, December 6 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 3.4 %
- Expected production: 7,280 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 48° 30' 22.2"
- Longitude: 16° 46' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 48° 30' 22.2"
- Longitude: 16° 46' 48.2"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 November 2022
Complete/correct this sheet: