Wind farms
Alto dos Forninhos (Portugal)| Alto dos Forninhos (Portugal) |
|
| Operational (8,2 MW) |

| Country | Portugal |
| County/Zone | Portalegre (Alentejo) |
| City | Portalegre |
| Wind farm type | Onshore wind farm |

![]() | 8.2 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Senvion MM92/2050 (x 4) |

![]() | |

| Coordinates | Latitude 39° 17' 28.4" - Longitude -7° 20' 58.2" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Pracana (51 km) Enerfer I (56 km) Perdigao (57 km) Serra da Lage (66 km) Serra da Amêndoa (69 km) Vergão (75 km) Cabeço da Rainha (79 km) Cabeco de Raihna II (79 km) Mougueiras (80 km) Pinhal Interior I (90 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Portalegre (Alentejo) : 8.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 1 December 2023 |
||