Generalities
|
|
Details
- City: Brachy
- Commissioning:

- 5 turbines: Nordex N90/2500 (power 2 500 kW, diameter 90 m)
- Hub height:

- Total nominal power: 12,500 kW
- Operational
- Onshore wind farm
- Developer: Ardian
- Operator: Kallista Energy
- Owner:

- Source:

Production forecast
- From Sunday, February 5 2023, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 74.7 %
- Expected production: 224,250 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 49° 48' 36"
- Longitude: 0° 56' 23.9"
- Altitude: 90 m
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Pictures

Author: Eric Zickler - License: All right reserved
Picture reference: 4115

Author: Eric Zickler - License: All right reserved
Picture reference: 4116

Author: Eric Zickler - License: All right reserved
Picture reference: 4117

Author: Eric Zickler - License: All right reserved
Picture reference: 4118

Author: Eric Zickler - License: All right reserved
Picture reference: 4119

Author: Eric Zickler - License: All right reserved
Picture reference: 4120

Author: Eric Zickler - License: All right reserved
Picture reference: 4121
Update for this sheet: 11 October 2022
Complete/correct this sheet: