[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Torsas
- Commissioning:

- 2 turbines: Enercon E82/2000 (power 2 000 kW, diameter 82 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: Eolus Vind AB
Production forecast
- From Wednesday, April 21 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 40.2 %
- Expected production: 38,610 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Torsas
- Commissioning:

- 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
- Hub height:

- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Operator: Eolus Vind AB
Production forecast
- From Wednesday, April 21 2021, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 43.1 %
- Expected production: 41,370 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Latitude: 56° 25' 47.2"
- Longitude: 16° 5' 6"
- Altitude: 5 m
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Latitude: 56° 25' 47.2"
- Longitude: 16° 5' 6"
- Altitude: 5 m
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 17 December 2020
Complete/correct this sheet: