Wind farms
Borja II (Arbolitas) (Spain)| Borja II (Arbolitas) (Spain) |
|
| Operational (21,51 MW) |

| Country | Spain |
| County/Zone | Zaragoza (Aragon) |
| City | Borja |
| Wind farm type | Onshore wind farm |

![]() | 7.26 MW commissioned |
![]() | 14.25 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() |
| Manufacturers |
|

| Operational | Neg Micon NM48/750 (x 19) |
| Operational | Gamesa G47/660 (x 11) |

| No source available |

| City | Borja |
| Commissioning | ![]() |
| Turbines | 11x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Hub height | ![]() |
| Total nominal power | 7,260 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 41° 52' 28.8" - Longitude -1° 34' 21.5" |
| Precise localization | No |
| City | Borja |
| Commissioning | ![]() |
| Turbines | 19x Neg Micon NM48/750 (power 750 kW, diameter 48.2 m) |
| Hub height | ![]() |
| Total nominal power | 14,250 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 41° 49' 47.9" - Longitude -1° 31' 48" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (658.2 GW) World (2,455.9 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Molino de Carragüeyes (0 km) Boquerón I (0 km) Molino de Arbolitas (0 km) Campo de Borja (0 km) Boquerón II (0 km) Boquerón III (0 km) Boyal II (0 km) Borja I (0 km) Boyal I (0 km) San Juan de Bargas (5 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Zaragoza (Aragon) : 4,329.6 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||