Wind farms
Waverly (KS) (USA)| Waverly (KS) (USA) |
|
| Operational (199 MW) |

| Country | USA |
| County/Zone | Kansas |
| City | Coffey |
| Other name | Ad Astra |
| Wind farm type | Onshore wind farm |

![]() | 189 MW commissioned |
![]() | 10 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owners |
![]() ![]() |
| Manufacturer |
|
| Site officiel | http://waverlywindfarm.com |

| Operational | Gamesa G114/2100 (x 90) |
| Operational | Gamesa G114/2000 (x 5) |

![]() | |
![]() | |
![]() | |
![]() | |

| Part | Ad Astra |
| City | Coffey |
| Commissioning | ![]() |
| Turbines | 90x Gamesa G114/2100 (power 2,100 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 189,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 38° 22' 1.5" - Longitude -95° 39' 22.8" |
| Precise localization | Yes |
| Part | Ad Astra |
| City | Coffey |
| Commissioning | ![]() |
| Turbines | 5x Gamesa G114/2000 (power 2,000 kW, diameter 114 m) |
| Hub height | ![]() |
| Total nominal power | 10,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 38° 22' 1.5" - Longitude -95° 39' 22.8" |
| Precise localization | Yes |
Databases ![]() USA (252.1 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Reading Wind project (36 km) Prairie Queen (54 km) Neosho Ridge Wind (96 km) St. Mary’s (98 km) Jayhawk Wind (99 km) Elk River (119 km) Kansas State University (122 km) Caney River (126 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Kansas : 9,632.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 17 December 2025 |
||