Wind farms
Sierra Selva I (Spain)| Sierra Selva I (Spain) |
|
| Operational (33 MW) |

| Country | Spain |
| County/Zone | Navarra |
| City | Petilla de Aragón |
| Wind farm type | Onshore wind farm |

![]() | 18.48 MW commissioned |
![]() | 14.52 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G47/660 (x 50) |

| No source available |

| City | Petilla de Aragón |
| Commissioning | ![]() |
| Turbines | 28x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Total nominal power | 18,480 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 26' 27.2" - Longitude -1° 6' 15.2" |
| Precise localization | Yes |
| City | Petilla de Aragón |
| Commissioning | ![]() |
| Turbines | 22x Gamesa G47/660 (power 660 kW, diameter 47 m) |
| Total nominal power | 14,520 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 42° 26' 27.2" - Longitude -1° 6' 15.2" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Sos del Rey Católico II (6 km) Sierra Selva (9 km) Sos del Rey Católico (14 km) Salajones (25 km) Aibar (30 km) Monlora I (34 km) Monlora II (34 km) Monlora III (34 km) Izco (34 km) Txutxu (35 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Navarra : 1,627.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||