Wind farms
Chapada Do Piaui 3 (Brazil)| Chapada Do Piaui 3 (Brazil) |
|
| Operational (59,2 MW) |

| Country | Brazil |
| County/Zone | Piaui (Nordeste) |
| City | Simoes |
| Wind farm type | Onshore wind farm |

![]() | 29.6 MW commissioned |
![]() | 29.6 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.85-82.5 (x 32) |

![]() | |
![]() | |

| Part | Ventos de Santo Augusto III |
| City | Simoes |
| Commissioning | ![]() |
| Turbines | 16x GE Vernova 1.85-82.5 (power 1,850 kW, diameter 82.5 m) |
| Total nominal power | 29,600 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude -7° 22' 20.6" - Longitude -40° 42' 25.9" |
| Precise localization | Yes |
| Part | Ventos de Santo Augusto V |
| City | Simoes |
| Commissioning | ![]() |
| Turbines | 16x GE Vernova 1.85-82.5 (power 1,850 kW, diameter 82.5 m) |
| Total nominal power | 29,600 kW |
| Status | Operational |
| Developer | ![]() |
| Owner | ![]() |
| Coordinates | Latitude -7° 24' 33.4" - Longitude -40° 41' 42.3" |
| Precise localization | Yes |
Databases ![]() Brazil (292.9 GW) Americas (614.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Chapada Do Piaui 1 (2 km) Chapada Do Piaui 2 (3 km) Ventos de São Zacarias (11 km) Ventos do Araripe III (Piaui) (12 km) Caldeirão Grande (14 km) Ventos do Araripe I (16 km) Ventos do Araripe III (Pernambuco) (36 km) Ventos Do Piaui 2 (62 km) Ventos de São Vicente 14 (66 km) Ventos de São Vicente 13 (67 km) | ||
|
Insights Production capacity Brazil : 34,866.0 MW (end of 2025) Piaui (Nordeste) : 6,115.4 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 28 October 2024 |
||