Part #1:

  • City: Eeklo (Ringlaan)
  • Commissioning: 2001/06
  • 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 86 m
  • Total nominal power: 3,600 kW
  • Operational
  • Onshore wind farm
  • Operator: Ecopower
  • Owner: Ecopower
  • Source: https://www.ecopower.be/onze-investeringen/eeklo-2

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 70.4 %
  • Expected production: 60,850 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Eeklo
  • Commissioning: 2011/12
  • 2 turbines: Enercon E82/2300 (power 2 300 kW, diameter 82 m)
  • Total nominal power: 4,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Ecopower
  • Operator: Ecopower
  • Owner: Ecopower

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 79.1 %
  • Expected production: 87,330 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • Part: Honderdbundermolen
  • City: Eeklo
  • Commissioning: 2002/02
  • 1 turbine: Enercon E40/600 (power 600 kW, diameter 40 m)
  • Hub height: 65 m
  • Total nominal power: 600 kW
  • Operational
  • Onshore wind farm
  • Developer: Aspiravi
  • Operator: Ecopower
  • Owner: Ecopower
  • Source: https://www.ecopower.be/onze-investeringen/eeklo-1

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 68.1 %
  • Expected production: 9,800 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • Part: Transeeklo
  • City: Eeklo
  • Commissioning: 2002/12
  • 1 turbine: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
  • Hub height: 86 m
  • Total nominal power: 1,800 kW
  • Operational
  • Onshore wind farm
  • Developer: Aspiravi
  • Operator: Electrawinds
  • Owner: Electrawinds
  • Source: http://www.aspiravi.be/en/our-projects/wind-onshore

       Production forecast

  • From Sunday, October 22 2017, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 70.3 %
  • Expected production: 30,370 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 51° 11' 47.3"
  • Longitude: 3° 34' 2.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51° 10' 46.3"
  • Longitude: 3° 31' 58.3"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Part: Honderdbundermolen
  • Latitude: 51° 11' 47.3"
  • Longitude: 3° 34' 2.8"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #4:

  • Part: Transeeklo
  • Latitude: 51° 10' 52.7"
  • Longitude: 3° 32' 26"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Global map



Satellite view




Update for this sheet: 14 June 2017