[Back to previous page]
Generalities
|
|
Details
- City: Olmedilla
- Commissioning:

- 25 turbines: Gamesa G87/2000 (power 2 000 kW, diameter 87 m)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Developers: Elecdey/Cobra
- Operator: Elecdey
- Source:

Production forecast
- From Sunday, August 14 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 12.3 %
- Expected production: 148,000 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 39° 45' 19.8"
- Longitude: -2° 2' 42.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 14 January 2022
Complete/correct this sheet: