Wind farms
Alto Palancia I (Spain)| Alto Palancia I (Spain) |
|
| Operational (26 MW) |

| Country | Spain |
| County/Zone | Castellon (Comunidad Valenciana) |
| City | Barracas - Viver |
| Wind farm type | Onshore wind farm |

![]() | 12 MW commissioned |
![]() | 14 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Gamesa G87/2000 (x 7) |
| Operational | Gamesa G80/2000 (x 6) |

| No source available |

| City | Barracas, Viver |
| Commissioning | ![]() |
| Turbines | 6x Gamesa G80/2000 (power 2,000 kW, diameter 80 m) |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 1' 12" - Longitude -0° 42' 0" |
| Precise localization | No |
| City | Barracas, Viver |
| Commissioning | ![]() |
| Turbines | 7x Gamesa G87/2000 (power 2,000 kW, diameter 87 m) |
| Total nominal power | 14,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 40° 1' 12" - Longitude -0° 42' 0" |
| Precise localization | No |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alto Palancia II (0 km) Alto Palancia III (1 km) Mazorral y Rajola (3 km) Alto Casillas I (7 km) Alto Casillas II (7 km) El Viudo I (21 km) El Viudo II (22 km) Cerro de la Nevera (26 km) Peñas de Dios I (31 km) Peñas de Dios II (31 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Castellon (Comunidad Valenciana) : 686.7 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 2 January 2024 |
||