[Back to previous page]
Generalities
|
|
Details
- City: Castellfort, Villafranca del Cid, Ares del Maestre
- Commissioning:

- 33 turbines: Acciona AW-1500/77 (power 1 500 kW, diameter 77 m)
- Total nominal power: 49,500 kW
- Operational
- Onshore wind farm
- Developer: Acciona Energia
- Operator: Acciona Energia
- Owner:

Production forecast
- From Friday, May 20 2022, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 32.5 %
- Expected production: 386,500 kWh
- Values from Weathernews Windcaster solution
Localisation
- Latitude: 40° 27' 58.8"
- Longitude: -0° 12' 52.6"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 0
Complete/correct this sheet: