Wind farms
Douro Sul (Portugal)| Douro Sul (Portugal) |
|
| Operational (125,05 MW) |

| Country | Portugal |
| County/Zone | Viseu (Centro/Norte) |
| City | Leomil |
| Wind farm type | Onshore wind farm |

![]() | 86.1 MW commissioned |
![]() | 38.95 MW commissioned |

| Developers |
![]() #ND |
| Operator | #ND |
| Owners |
![]() #ND |
| Manufacturer |
|

| Operational | Senvion MM92/2050 (x 61) |

![]() | |
![]() | |

| Part | Moimenta |
| City | Leomil |
| Commissioning | ![]() |
| Turbines | 42x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Total nominal power | 86,100 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 40° 58' 9" - Longitude -7° 41' 1.8" |
| Precise localization | Yes |
| Part | Três Marcos |
| City | Leomil |
| Commissioning | ![]() |
| Turbines | 19x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Hub height | ![]() |
| Total nominal power | 38,950 kW |
| Status | Operational |
| Owner | ND |
| Coordinates | Latitude 40° 58' 9" - Longitude -7° 41' 1.8" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Leomil (2 km) Nave (6 km) Vigia (9 km) Mourisca (10 km) Santa Helena (PT) (11 km) Testos (14 km) Alto Douro (14 km) Ribabelide (17 km) São Cristóvão (20 km) Vila Lobos (20 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Viseu (Centro/Norte) : 1,161.9 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 11 June 2026 |
||