Wind farms
Høgsted By (Denmark)| Høgsted By (Denmark) |
|
| Operational (10,35 MW) |

| Country | Denmark |
| County/Zone | Hjorring (Nordjylland) |
| City | Vrejlev |
| Wind farm type | Onshore wind farm |

![]() | 10.35 MW commissioned |

| Developer | #ND |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V117/3450 (x 3) |

![]() | |

| Hub height | ![]() |
| Coordinates | Latitude 57° 21' 44" - Longitude 10° 0' 0.1" |
| Precise localization | No |
Databases ![]() Denmark (10.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Guldager (Hjorring) (2 km) Gunderup (Hjorring) (2 km) Arup (DK) (3 km) Vra (Frederikshavn) (3 km) Smidstrup (Hjorring) (6 km) Vollerup (Hjorring) (7 km) Tars (Hjorring) (7 km) Vejby (Hjorring) (8 km) Sterup (8 km) Tolstrup (Bronderslev) (9 km) | ||
|
Insights Production capacity Denmark : 7,508.0 MW (end of 2025) Hjorring (Nordjylland) : 138.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 16 October 2017 |
||