Wind farms
Yazizhen (China)| Yazizhen (China) |
|
| Operational (48 MW) |

| Country | China |
| County/Zone | Shandong |
| City | Yazizhen |
| Other name | Rushan I |
| Wind farm type | Onshore wind farm |

![]() | 48 MW commissioned |

| Developer | #ND |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Taiyuan Heavy Machinery Group (x 24) |

| No source available |

| Coordinates | Latitude 37° 7' 29.2" - Longitude 121° 16' 34.3" |
| Precise localization | No |
Databases ![]() China (683.2 GW) Asia (1,032.9 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Muping Shuidao (24 km) Haiyang Pileishan (24 km) Xujiadian Phase I (26 km) Haiyang Paomaling (28 km) Haiyang Duoshan (30 km) Weihai Shanmayu (30 km) Qixia Tangshan (38 km) Haiyang Dongfang (40 km) Haiyang (40 km) Fushan Gaotuan (44 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Shandong : 22,199.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 September 2022 |
||