Wind farms
El Conjuro (Spain)| El Conjuro (Spain) |
|
| Operational (30,6 MW) |

| Country | Spain |
| County/Zone | Granada (Andalucía) |
| City | Gualchos - Lújar - Motril - Motril-Gualchos - Vélez Benaudalla |
| Wind farm type | Onshore wind farm |

![]() | 11.9 MW commissioned |
![]() | 5.1 MW commissioned |
![]() | 13.6 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Gamesa G58/850 (x 22) |
| Operational | Gamesa G52/850 (x 14) |

| No source available |

| City | Motril, Gualchos, Vélez Benaudalla, Lújar |
| Commissioning | ![]() |
| Turbines | 14x Gamesa G52/850 (power 850 kW, diameter 52 m) |
| Total nominal power | 11,900 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 36° 48' 41.1" - Longitude -3° 29' 35.3" |
| Precise localization | No |
| City | Motril, Gualchos, Vélez Benaudalla, Lújar |
| Commissioning | ![]() |
| Turbines | 6x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 5,100 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Coordinates | Latitude 36° 48' 41.1" - Longitude -3° 29' 35.3" |
| Precise localization | No |
| City | Motril-Gualchos |
| Commissioning | ![]() |
| Turbines | 16x Gamesa G58/850 (power 850 kW, diameter 58 m) |
| Total nominal power | 13,600 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 36° 44' 9.6" - Longitude -3° 24' 47.7" |
| Precise localization | Yes |
Databases ![]() Spain (52.7 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Las Lomas (ES) (21 km) Albaicin (28 km) Lecrin (28 km) Lomas de Lecrin (29 km) Lomas de Manteca (29 km) La Pinta (31 km) Loma del Capón (33 km) Parque Eólico Experimental Cerros Pelaos (37 km) Padul (37 km) Mamut (37 km) | ||
|
Insights Production capacity Spain : 33,158.0 MW (end of 2025) Granada (Andalucía) : 412.2 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 3 January 2024 |
||