Wind farms
Chaminé (Portugal)| Chaminé (Portugal) |
|
| Operational (6,9 MW) |

| Country | Portugal |
| County/Zone | Setúbal (Alentejo/Lisboa) |
| City | Sines |
| Wind farm type | Onshore wind farm |

![]() | 2.3 MW commissioned |
![]() | 4.6 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | Nordex N90/2300 (x 3) |

![]() | |
![]() | |

| City | Sines |
| Commissioning | ![]() |
| Turbines | 2x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 4,600 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 51' 57.2" - Longitude -8° 45' 2.3" |
| Altitude | 100 m |
| Precise localization | Yes |
| City | Sines |
| Commissioning | ![]() |
| Turbine | 1x Nordex N90/2300 (power 2,300 kW, diameter 90 m) |
| Hub height | ![]() |
| Total nominal power | 2,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 37° 51' 57.2" - Longitude -8° 45' 2.3" |
| Altitude | 100 m |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Costa Vicentina (2 km) Moinho dos Chãos (13 km) Madrinha (63 km) Bordeira (70 km) Guerreiros (71 km) Espinhaço de Cao (72 km) Corte dos Alamos (72 km) Barao de Sao Joao (78 km) Serra do Mu (80 km) Pico Alto (81 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Setúbal (Alentejo/Lisboa) : 31.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 26 September 2024 |
||