Wind farms
Alagoa de Cima (Portugal)| Alagoa de Cima (Portugal) |
|
| Operational (13,5 MW) |

| Country | Portugal |
| County/Zone | Viana do Castelo (Norte) |
| Wind farm type | Onshore wind farm |

![]() | 1.5 MW commissioned |
![]() | 12 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer |
|

| Operational | GE Vernova 1.5s (x 9) |

![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 8x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Total nominal power | 12,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 50' 24" - Longitude -8° 25' 11.9" |
| Precise localization | Yes |
| City | #ND |
| Commissioning | ![]() |
| Turbine | 1x GE Vernova 1.5s (power 1,500 kW, diameter 70.5 m) |
| Total nominal power | 1,500 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 58' 18.1" - Longitude -8° 26' 46.5" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alto Minho (4 km) As Neves (13 km) Montouto 2000 (21 km) Arbo (21 km) Sao Paio (23 km) Fonteavia II (27 km) Arga (27 km) Fonte da Lameira (28 km) Fonteavia I (28 km) Espiga (35 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Viana do Castelo (Norte) : 370.3 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 June 2024 |
||