Wind farms
Azinheira (Portugal)| Azinheira (Portugal) |
|
| Operational (16,8 MW) |

| Country | Portugal |
| County/Zone | Braga (Norte) |
| City | Celorico de Basto |
| Wind farm type | Onshore wind farm |

![]() | 8 MW commissioned |
![]() | 6 MW commissioned |
![]() | 2.8 MW commissioned |

| Developers |
![]() #ND |
| Operators |
![]() ![]() #ND |
| Owners |
![]() ![]() #ND |
| Manufacturer |
|

| Operational | Enercon E82/2000 (x 7) |
| Operational | Enercon (x 1) |

![]() | |
![]() | |

| City | Celorico de Basto |
| Commissioning | ![]() |
| Turbines | 4x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 8,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owners | /![]() |
| Coordinates | Latitude 41° 25' 37.2" - Longitude -8° 3' 29.1" |
| Precise localization | Yes |
| City | Celorico de Basto |
| Commissioning | ![]() |
| Turbines | 3x Enercon E82/2000 (power 2,000 kW, diameter 82 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 25' 37.2" - Longitude -8° 3' 29.1" |
| Precise localization | Yes |
| City | Celorico de Basto |
| Commissioning | ![]() |
| Turbine | 1x Enercon |
| Total nominal power | 2,800 kW |
| Status | Operational |
| Coordinates | Latitude 41° 25' 36.8" - Longitude -8° 3' 29.3" |
| Precise localization | Yes |
Databases ![]() Portugal (11.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Alfarrobeira (1 km) Viso (2 km) Terras Altas Fafe (6 km) Penouta (PT) (7 km) Tâmega (14 km) Vila Cova (19 km) Lomba do Vale (20 km) Alvao (21 km) Outeiro (21 km) Alto do Marco (22 km) | ||
|
Insights Production capacity Portugal : 5,990.0 MW (end of 2025) Braga (Norte) : 457.8 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 6 June 2024 |
||