Wind farms
Beitashan III (China)| Beitashan III (China) |
|
| Operational (49,5 MW) |

| Country | China |
| County/Zone | Xinjiang |
| City | Beitashan |
| Wind farm type | Onshore wind farm |

![]() | 49.5 MW commissioned |

| Developer |
![]() |
| Operator |
![]() |
| Owner |
![]() |
| Manufacturer | #ND |

| Operational | #ND (x 33) |

| No source available |

| Coordinates | Latitude 44° 0' 52.9" - Longitude 89° 35' 26.1" |
| Precise localization | No |
Databases ![]() China (709.9 GW) Asia (1,057.0 GW) World (2,490.2 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Beitashan II (0 km) Beitashan I (0 km) Beitashan IV (0 km) Qitai Lixin (2 km) Qitai (2 km) Qitai Beitashan (38 km) Mori Huadian Kaisheng (46 km) Mori Green Power Substitution (56 km) Gurbantünggüt Desert Renewables Base Mori (59 km) Mulei (59 km) | ||
|
Insights Production capacity China : 640,626.0 MW (end of 2025) Xinjiang : 79,933.1 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 2 September 2022 |
||