Wind farms
Ginestra (Italy)| Ginestra (Italy) |
|
| Operational (51,9 MW) |

| Country | Italy |
| County/Zone | Campania |
| Wind farm type | Onshore wind farm |

![]() | 16.4 MW commissioned |
![]() | 12.3 MW commissioned |
![]() | 8.2 MW commissioned |
![]() | 15 MW commissioned |

| Developers |
![]() ![]() |
| Operators |
![]() #ND |
| Owners |
![]() #ND |
| Manufacturers |
|

| Operational | Senvion MM92/2050 (x 18) |
| Operational | GE Vernova 2.5xl (x 6) |

![]() | |
![]() | |

| City | #ND |
| Commissioning | ![]() |
| Turbines | 8x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Total nominal power | 16,400 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 16' 30.9" - Longitude 15° 3' 35.6" |
| Precise localization | Yes |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 6x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Total nominal power | 12,300 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 16' 30.9" - Longitude 15° 3' 35.6" |
| Precise localization | Yes |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 4x Senvion MM92/2050 (power 2,050 kW, diameter 92.5 m) |
| Total nominal power | 8,200 kW |
| Status | Operational |
| Developer | ![]() |
| Operator | ![]() |
| Owner | ![]() |
| Coordinates | Latitude 41° 16' 30.9" - Longitude 15° 3' 35.6" |
| Precise localization | Yes |
| Part | Cesi Pilani |
| City | #ND |
| Commissioning | ![]() |
| Turbines | 6x GE Vernova 2.5xl (power 2,500 kW, diameter 100 m) |
| Hub height | ![]() |
| Total nominal power | 15,000 kW |
| Status | Operational |
| Developer | ![]() |
| Coordinates | Latitude 41° 15' 51.8" - Longitude 15° 1' 21.9" |
| Precise localization | Yes |
Databases ![]() Italy (102.1 GW) Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Casalbore (2 km) San Giorgio La Molara (4 km) Castelfranco (5 km) Ginestra di Schiavoni (6 km) Monte Falcone (7 km) San Giorgio La Molara 2 (7 km) Monticelli (9 km) Molinara (10 km) San Chirico (11 km) Roseto Valfortore (11 km) | ||
|
Insights Production capacity Italy : 13,481.0 MW (end of 2025) Campania : 1,772.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 21 April 2025 |
||