Wind farms
Mason City (USA)| Mason City (USA) |
|
| Operational (10 MW) |

| Country | USA |
| County/Zone | Iowa |
| City | Cerro Gordo |
| Wind farm type | Onshore wind farm |

![]() | 4 MW commissioned |
![]() | 6 MW commissioned |

| Developers |
![]() ![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | CSIC HZ Windpower H111-2000 (x 5) |

![]() | |

| City | Cerro Gordo |
| Commissioning | ![]() |
| Turbines | 2x CSIC HZ Windpower H111-2000 (power 2,000 kW, diameter 111 m) |
| Hub height | ![]() |
| Total nominal power | 4,000 kW |
| Status | Operational |
| Developers | /![]() |
| Coordinates | Latitude 43° 8' 13.1" - Longitude -93° 6' 34.3" |
| Precise localization | Yes |
| City | Cerro Gordo |
| Commissioning | ![]() |
| Turbines | 3x CSIC HZ Windpower H111-2000 (power 2,000 kW, diameter 111 m) |
| Hub height | ![]() |
| Total nominal power | 6,000 kW |
| Status | Operational |
| Developers | /![]() |
| Coordinates | Latitude 43° 5' 57.4" - Longitude -93° 13' 48.8" |
| Precise localization | Yes |
Databases ![]() USA (255.3 GW) Americas (617.4 GW) World (2,464.1 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Mason City Wind (12 km) Cerro Gordo Repower (20 km) Cerro Gordo (20 km) Roeder Farms (22 km) Top of Iowa III (29 km) Top of Iowa II (30 km) Top of Iowa (31 km) Wind Walkers (32 km) Windway Technologies (34 km) Barton (35 km) | ||
|
Insights Production capacity USA : 158,826.0 MW (end of 2025) Iowa : 15,858.3 MW (*) |
||
|
Legend #ND: no data (*): according to The Wind Power database |
||
|
Update for this sheet 16 January 2026 |
||