Wind farms
La Piccolina (Serbia)| La Piccolina (Serbia) |
|
| Operational (6,6 MW) |

| Country | Serbia |
| County/Zone | Vojvodina |
| City | Zagajica |
| Wind farm type | Onshore wind farm |

![]() | 6.6 MW commissioned |

| Developer |
![]() |
| Operator | #ND |
| Owner | #ND |
| Manufacturer |
|

| Operational | Vestas V112/3300 (x 2) |

![]() | |
![]() | |

| Coordinates | Latitude 44° 59' 47.9" - Longitude 21° 13' 36.1" |
| Precise localization | Yes |
Databases ![]() Europe (654.1 GW) World (2,450.5 GW) All databases |
||
PDF Summary
|
||
| Nearby wind farms Kosava 1 (1 km) Kosava 2 (5 km) Alibunar (24 km) Cibuk (25 km) Plandiste 1 (27 km) Bela Anta (30 km) Cibuk 2 (30 km) Vetrozelena (30 km) Kostolac (33 km) Ram (36 km) | ||
|
Insights Production capacity Serbia : 807.0 MW (end of 2025) Vojvodina : 1,330.1 MW (*) |
||
|
Légende #ND : no data (*) : according to The Wind Power database |
||
|
Update for this sheet 16 January 2026 |
||