[Back to previous page]
Generalities
- Wind farm name: Le Nordais
- Country: Canada
- County / Zone: Québec
|
|
Details
Part #1:
- Part: Phase I
- City: Cap-Chat
- Commissioning: 1999/03
- 75 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height: 55 m
- Total nominal power: 56,250 kW
- Operational
- Onshore wind farm
- Developer: TransAlta
- Operator: TransAlta
- Owner: TransAlta
- Source: http://www.transalta.com/facilities/plants-operation
- Source: https://canwea.ca/fr/marches-eoliens/puissance-installee/
Part #2:
- Part: Phase II
- City: Matane
- Commissioning: 1999/09
- 57 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
- Hub height: 55 m
- Total nominal power: 42,750 kW
- Operational
- Onshore wind farm
- Developer: TransAlta
- Operator: TransAlta
- Owner: TransAlta
- Source: http://www.transalta.com/facilities/plants-operation
- Source: https://canwea.ca/fr/marches-eoliens/puissance-installee/
Localisation
Part #1:
- Part: Phase I
- Latitude: 48° 45' 35.9"
- Longitude: -67° 32' 24"
- Geodetic system: WGS84
- Precise localization: no
Part #2:
- Part: Phase II
- Latitude: 48° 47' 23.9"
- Longitude: -67° 28' 48"
- Geodetic system: WGS84
- Precise localization: no
Update for this sheet: 12 April 2019
Complete/correct this sheet: