			Generalities
						
		 | 
		
							 
				
					 | 
	
Details
Part #1: 
- City: Beringen
 - Commissioning: 

 - 3 turbines: Senvion MM92/2050 (power 2 050 kW, diameter 92.5 m)
 - Hub height: 

 - Total nominal power: 6,150 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 
Part #2: 
- City: Beringen
 - Commissioning: 

 - 2 turbines: (manufacturer name not available)  
 - Total nominal power: 4,700 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 
Part #3: 
- City: Beringen
 - Commissioning: 

 - 2 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
 - Hub height: 

 - Total nominal power: 4,600 kW
 - Operational
 - Onshore wind farm
 - Developer: Aspiravi
 - Operator: Aspiravi
 - Owners: 
/
 - Source: 

 - Source: 

 
Part #4: 
- City: Beringen
 - Commissioning: 

 - 1 turbine: (manufacturer name not available)  
 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 - Source: 

 
Part #5: 
- Part: Katoennatie
 - City: Beringen, Tessenderlo
 - Commissioning: 

 - 2 turbines: Vestas V90/2000 (power 2 000 kW, diameter 90 m)
 - Hub height: 

 - Total nominal power: 4,000 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 
Part #6: 
- Part: Madinvest
 - City: Beringen
 - Commissioning: 

 - 1 turbine: Senvion MM100 (power 2 000 kW, diameter 100 m)
 - Hub height: 

 - Total nominal power: 2,000 kW
 - Operational
 - Onshore wind farm
 - Owner: 

 
Localisation
Part #1: 
Part #2: 
- Latitude: 51° 3' 39.9"
 - Longitude: 5° 11' 52.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #3: 
Part #4: 
- Latitude: 51° 3' 39.9"
 - Longitude: 5° 11' 52.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Part #5: 
Part #6: 
- Part: Madinvest
 - Latitude: 51° 3' 39.9"
 - Longitude: 5° 11' 52.3"
 - Geodetic system: WGS84
 - Precise localization: no
 
Update for this sheet: 22 March 2025