[Back to previous page]
Generalities
|
|
Details
Part #1:
- Part: First
- City: Valhuon
- Commissioning:

- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Innovent
- Operator: First Valhuon
- Owner:

- Source:

Production forecast
- From Thursday, June 8 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 17.9 %
- Expected production: 8,580 kWh
- Values from Weathernews Windcaster solution
Part #2:
- Part: Innovent
- City: Valhuon
- Commissioning:

- 1 turbine: Enercon E70/2000 (power 2 000 kW, diameter 70 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developer: Innovent
- Operator: Innovent
- Owner:

- Source:

Production forecast
- From Thursday, June 8 2023, 02:00 UTC, for the coming 24 hours:
- Expected load rate: 17.9 %
- Expected production: 8,580 kWh
- Values from Weathernews Windcaster solution
Localisation
Part #1:
- Part: First
- Latitude: 50° 25' 12"
- Longitude: 2° 22' 47.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Part: Innovent
- Latitude: 50° 25' 12"
- Longitude: 2° 22' 47.9"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 11 August 2022
Complete/correct this sheet: