[Back to previous page]
Generalities
|
|
Details
Part #1:
- City: Delitzsch, Schönwölkau
- Commissioning:

- 1 turbine: Nordex N50/800 (power 800 kW, diameter 50 m)
- Hub height:

- Total nominal power: 800 kW
- Operational
- Onshore wind farm
Production forecast
- From Wednesday, January 27 2021, 01:00 UTC, for the coming 24 hours:
- Expected load rate: 0 %
- Expected production: 0 kWh
- Values from Weathernews Windcaster solution
Part #2:
- City: Delitzsch, Schönwölkau
- Commissioning:

- 2 turbines: Nordex N54/1000 (power 1 000 kW, diameter 54 m)
- Hub height:

- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Delitzsch, Schönwölkau
- Commissioning:

- 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
Part #4:
- City: Delitzsch, Schönwölkau
- Commissioning:

- 2 turbines: Enercon E66/1800 (power 1 800 kW, diameter 66 m)
- Hub height:

- Total nominal power: 3,600 kW
- Operational
- Onshore wind farm
- Operator: Envia
- Owner:

Localisation
Part #1:
- Latitude: 51° 30' 11"
- Longitude: 12° 23' 36.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #2:
- Latitude: 51° 30' 11"
- Longitude: 12° 23' 36.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #3:
- Latitude: 51° 30' 11"
- Longitude: 12° 23' 36.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Part #4:
- Latitude: 51° 30' 11"
- Longitude: 12° 23' 36.7"
- Geodetic system: WGS84
- Precise location: yes
- Google Maps view
Update for this sheet: 8 April 2019
Complete/correct this sheet: